Preliminary Land Feasibility Calculator

Use manual parcel and project assumptions to estimate yield, development cost, gross revenue, net profit, ROI, risk flags, and next due diligence steps.

Need a lender/investor-ready report? Request an expert-assisted review, order a one-time feasibility report, or use a subscription when you analyze multiple parcels and want to reduce your cost per report.

Feasibility calculator

Build a preliminary land development scenario

Enter the parcel, development type, cost stack, and revenue assumptions. LandeVision will calculate a deterministic first-pass report and save a shareable version when the database is available.

1. Property
2. Development scenario
Zoning and advanced assumptions
3. Costs
4. Revenue and financing

Step 5. Results

Preliminary feasibility result

Risk: High
Net usable acres
9.2
Units
14
Buildable sq ft
50,400
Total project cost
$23,172,039
Projected revenue
$16,800,000
Net profit
-$6,372,039
ROI
-27.5%
Equity need
$8,110,214

Cost breakdown

Land cost$4,200,000
Sitework / horizontal cost$2,210,750
Hard construction cost$10,584,000
Soft costs$1,905,120
Professional fees$423,360
Permits / impact fees$252,000
Utility allowance$392,000
Contingency$1,261,378
Sales and marketing$840,000
Financing or holding$1,103,430
Cost per unit$1,655,146
Cost per sq ft$460

Sensitivity

Conservative$15,456,000-$9,569,802-38.2%
Base$16,800,000-$6,372,039-27.5%
Upside$18,144,000-$4,101,157-18.4%

Risk flags

  • Low preliminary ROI: The base case ROI is below a common early-screening threshold. Sensitivity analysis and entitlement risk deserve extra review.
  • Zoning not confirmed: Current zoning, future land use, overlays, buffers, and allowable density must be verified before relying on the scenario.
  • Entitlement path requires review: Rezoning, conditional use, variances, site plan approval, or public hearings can change timing, cost, and approval probability.
  • Equity return cushion may be limited: Projected profit is modest relative to estimated equity need. Stress-test leverage, interest rate, absorption, and exit pricing.
  • County missing: County is important for zoning, entitlement process, utilities, impact fees, and local review paths.
  • Utilities not verified: Water, sewer, stormwater, access, fire flow, and off-site improvements can change feasibility materially.
  • Environmental constraints unknown: Wetlands, floodplain, stream buffers, topography, soils, and protected areas require professional verification.

Next due diligence steps

  1. Confirm zoning, future land use, overlays, and entitlement path with the local planning department.
  2. Ask a civil engineer to review access, utilities, stormwater, grading, floodplain, wetlands, and off-site improvement exposure.
  3. Validate unit yield and site plan fit with an architect or land planner.
  4. Pressure-test sales, rent, exit cap rate, absorption, financing, and construction cost assumptions.
  5. Review title, survey, easements, environmental reports, taxes, impact fees, and legal constraints before purchase or LOI.
Preliminary screening only. Outputs are estimates from user inputs and must be verified by licensed professionals and local authorities.